Implementasi Lean Warehousing untuk Meminimasi Waste di Gudang PT XYZ

Jihan Fitriyah, Dira Ernawati, Nur Rahmawati

Abstract


The purpose of this study is to identify waste in the warehousing process using value stream mapping and provide suggestions for improvements to the efficiency of warehousing operations at PT XYZ. This study uses a lean warehousing approach with the value stream mapping method, process activity mapping, gemba shikumi, and 5 whys analysis. The results of this study concluded that improvements by simplifying the process activity mapping resulted in a reduction of 10 warehousing activities, for each type of activity, a reduction of 12 types of activities was obtained. Then the time obtained previously from 268,000 minutes became 266,384 minutes, thus saving 1,616 seconds or 26 minutes 56 seconds at PT XYZ.


Keywords


gemba shikumi, lean warehousing, value stream mapping. warehousing

Full Text:

PDF

References


Ahmad, A. N. A., Jufri, M. F., Ahmad, M. F., 2021. Lean dan Value Stream Mapping terhadap Pengurangan Masa Operasi. Research in Management of Technology and Business, 2(1), 640–650.

Anggraini, W., Ilhamda, A. N., 2020). Perbaikan Efisiensi Jalur Layanan Pasien Rumah Sakit dengan Menggunakan Pendekatan Lean Healthcare. INOBIS: Jurnal Inovasi Bisnis dan Manajemen Indonesia, 3(4), 509–521.

Dotoli, M., Epicoco, N., Falagario, M., Costantino, N., 2015. A lean warehousing integrated approach: A case study. IEEE International Conference on Emerging Technologies and Factory Automation, ETFA.

Hadisantono, Jati, V. N. K., 2023. Reduksi pemborosan di gudang suku cadang distributor alat berat dengan perbaikan tata letak. Jurnal Teknik Industri Dan Manajemen Rekayasa, 1(2), 117–132.

Ibrahim, N. G., Prasetyawan, Y., 2021. Evaluasi Pergudangan dengan Pendekatan Lean Warehousing dan Linear Programming (Studi Kasus PT. X). Jurnal Teknik ITS, 9(2), 278–283.

Lestari, K., & Susandi, D., 2019. Penerapan Lean Manufacturing untuk mengidentifikasi waste pada proses produksi kain knitting di lantai produksi PT. XYZ. Prosiding Industrial Research Workshop and National Seminar, 10(1), 567–575.

Martono, R., V. 2019. Dasar-dasar Manajemen Rantai Pasok. Jakarta: Bumi Aksara

Moengin, P., 2020. Lean Manufacturing untuk Meminimasi Lead Time dan Waste agar Tercapainya Target Produksi (Studi kasus PT . Rollflex Manufacturing Indonesia). Jurnal Teknik Industri, 11(1), 77–88.

Nugraha, M. F., Nofrisel, N., Setyawati, A. 2023. Pendekatan Lean Six Sigma Untuk Meminimasi Waste Pada Proses Produksi Sepatu Industri Manufaktur Alas Kaki Kelas Dunia. Mutiara: Multidiciplinary Scientifict Journal, 1(8), 416–430.

Pacheco, D. A. de J., Clausen, D. M., Bumann, J., 2023. A multi-method approach for reducing operational wastes in distribution warehouses. International Journal of Production Economics, 256(June 2022).

Pertiwi, I. M., Herlambang, F. S., Kristinayanti, W. S., 2019. Analisis Waste Material Konstruksi Pada Proyek Gedung (Studi Kasus Pada Proyek Gedung Di Kabupaten Badung). Jurnal Simetrik, 9(1), 185–190.

Sunyoto, D., 2016, Metode Penelitian Akuntansi, Cetakan ke-2, PT. Refika Aditama

Situmorang, N., Sirait, G., 2022. Analisis Penerapan Lean Warehousing Pada Pergudangan di PT Durian.




DOI: http://dx.doi.org/10.33087/ekonomis.v9i2.1916

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Ekonomis: Journal of Economics and Business Published by Lembaga Penelitian dan Pengabdian kepada Masyarakat
Adress: LPPM Universitas Batanghari, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: ekonomis.unbari@gmail.com, Phone: 0741-670700


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.